Mar. 12th, 2021

Now that the weather's finally warming up, I can use hide glue! My only ventilated workspace is my backyard, so I was stuck for a while after that first snow. The next steps are:

- fill in holes with sawdust and re-ream, to patch tearout and general wear

- stain? and oil neck

- apply veneer to front

- reattach bridge

- sand down back

- apply veneer to back

- seal edges

- string it and hope I didn't wreck anything

Profile

molluscsandmonsters: tiny decorative tin box featuring sea snails and environmental pressures that make them grow differently; a wave for wave action on surf side rocks, a crab for predation on sound side rocks (Default)
molluscsandmonsters

Some Tags

Style Credit

Page generated Jun. 17th, 2025 06:03 am
Powered by Dreamwidth Studios